Linus Pauling Science Center at Oregon State University
Harder leveraged BIM technologies to build a 3D model of this state-of-the-art facility.
Linus Pauling Science Center at Oregon State University
Harder leveraged BIM technologies to build a 3D model of this state-of-the-art facility.
Project Details
Location
Corvallis, OR
Contract Value
$74 Million
GC
Andersen
Market
Commercial - Higher Education
Completed In
2011
Project Summary
Leading the way at OSU
As science and health technology continues to evolve and move forward, Harder Mechanical is at the forefront of construction at our higher education institutions. The Linus Pauling Science Center at Oregon State University is a leading example of how research facilities play a significant role in enhancing human health.
Harder Mechanical provided the complete mechanical installation of the 4-story, 100,000 sq. ft. building. Our construction team self-performed all facets of the plumbing and hydronics that included 74,000 linear feet of process piping. BIM was leveraged for clash detection that greatly enhanced the ability to install the specialty exhaust systems that are unique for the state-of-the-art laboratories, equipment, and suites that provide a rich environment for student collaboration and learning.
Harder’s safety record continued to excel as this project was completed on time with zero recordable injuries.
Project Gallery
Services Used
Related Projects
Our Architectural Sheet Metal team fabricated intricate architectural metalwork that gave the Northwest Library a distinctive identity.
Our Architectural Sheet Metal team engineered cost-saving solutions that accelerated construction of the Reser Stadium expansion.
Harder is supporting the major Terminal Core remodel within the Portland International Airport.