Kennecott Copper Mine Smelter Furnace Repair
Harder inspected the furnace, then welded chrome moly plates inside the walls to strengthen the furnace. All work was completed within a three-week planned shutdown.
Kennecott Copper Mine Smelter Furnace Repair
Harder inspected the furnace, then welded chrome moly plates inside the walls to strengthen the furnace. All work was completed within a three-week planned shutdown.
Project Details
Location
Magna, UT
Contract Value
$300,000
GC
HMC
Market
Industrial - Industrial Manufacturing
Completed In
2020
Project Summary
Furnace Inspection and Repairs
This furnace outage work at the Rio Tinto Kennecott Smelter included cutting holes in the carbon steel FS furnace duct for inspection, inspecting patch openings with new rolled CS plates, repair of existing plate liners in two electrostatic precipitator hoppers, and new alloy liner plates.
Services Used
Related Projects
Prefabrication, precision piping, and mechanical installations power the next phase of electric vehicle manufacturing at this state-of-the-art plant.